GT3F-2AF20
100
5351613-GT3F-2AF20
RELAY TIME DELAY 600SEC 3A 250V
Parts can have many statuses as they progress through the configuration, analysis, review, and approval stages.
The Maximum Operating Temperature is the maximum body temperature at which the thermistor is designed to operate for extended periods of time with acceptable stability of its electrical characteristics.
Power consumption is the amount of input energy (measured in watts) required for an electrical appliance to function. This is opposed to power output which is a measure of the level of performance, of a heat pump for example.
The amount of time by which the arrival of a signal is retarded after transmission through physical equipment or systems.
The initiation time (also known as release time) is the time at which the process goes from the waiting to the ready state. An aperiodic process is by definition initiated by an event, such as external data arriving or data computed by another process.
RoHS means “Restriction of Certain Hazardous Substances” in the “Hazardous Substances Directive” in electrical and electronic equipment.